Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Effective date reached. Roadmap Item Retired
Page Properties
id1

ID

RM153

Version

2.0.0

Type

Roadmap Item

Framework(s)

Page Properties
id2

Title

GEN2 Uplifts to Non-Foundation Capabilities - Group 2

Description

Uplifts made to the next group of Capabilities (including retiring their Capability Specific Standards) to support the GEN2 strategy

Date Added

TBC

Standards and Capabilities

Workflow, Workflow  Workflow - Standard, Communication Management, Communication  Communication Management - Standard, Digital  Digital Diagnostics, Digital  Digital Diagnostics - Standard, Document  Document Management, Document Management - Standard, GP  GP Extracts Verification, GP  GP Extracts Verification - Standard, Unstructured  Unstructured Data Extraction, Unstructured  Unstructured Data Extraction - Standard, Scanning Scanning, Cross-organisation Appointment Booking

Change Route

Minor / Patch 

Change Type

Uplift

Status

DraftClosed

Publication Date

Effective Date

Incentives / Funding

No

Incentive / Funding Dates

N/A

...

  1. A more permissible model with a minimum number of MUST Epics in each Capability to cover:

    1. Scope of Capability generally (may be more than 1, but keeping to a minimum)

    2. Serious Clinical Safety implications if not a MUST and there isn’t a safe alternative

    3. Covers Legal Requirements for Practices

    4. Supports the Practice meeting their obligations under the GP Contract

    5. Any mandated national Interoperability Standards mapped to that Capability

    6. To cover any other Standards that map specifically to that Capability e.g. Management Information Reporting Standard or eMED3 Standard (this does not include Overarching Standards)

  2. Majority of existing MUST Epics will change to be MAYs and new MAY Epics will be added in some cases to replace requirements from within Capability Specific Standards

    1. This allows the Supplier to choose which MAY EPICs to implement and evidence. We expect the Suppliers to recognise the need to provide a comprehensive product based on their user feedback and their desire to be competitive against other solutions

  3. Mandatory Overarching Standards will remain

  4. A number of Standards are planned to be removed as part of the GEN2 transition, including Capability Specific Standards (e.g. Appointments Management - Citizen - Standard) once the requirements within have been reviewed and one of the following actions taken: 

    1. Requirement is removed and re-written as part of the Epics and Acceptance Criteria within the associated Capability (i.e. as a completely new Epic or as amendments to an existing Epic)

    2. Requirement is removed and the important details added as Additional Implementation Details against an Epic within the associated Capability

    3. Requirement is removed and the important details added as Supporting Information against an Epic within the associated Capability (this could be directly against the Epic or on a Reference Page referenced from the Supporting Information against the Epic)

    4. Requirement is removed entirely (i.e. because it is a duplicate requirement and doesn’t specify anything that isn’t already covered by an Epic or it is deemed non-essential and too low level for the Epics)

    5. Requirement is moved into another Standard

...

  • Update Workflow Capability to version 1.0.2

  • Retire Workflow - Standard  Standard 

  • 'Task' Epics moved from Workflow Capability version 1.0.1 to new Capability 'Task Management' 

...

  • New Capability ‘Task Management’ added to the model version 1.0.0

  • Incorporated the ‘Task’ Epics from Workflow Capability version 1.0.1 and Task related requirements from Workflow from Workflow - Standard  Standard 

Communication Management

  • Update Communication Management Capability to version 1.0.2

  • Retire Communication Management - Standard

Digital Diagnostics

  • Update Digital Diagnostics Capability to version 1.0.2

  • Retire Digital Diagnostics - Standard

Document Management

  • Incorporate Unstructured Data Extraction Epics/ACs into Document Management Capability 

  • Update Document Management Capability to version 1.0.2

  • Retire Document Management - Standard

GP Extracts Verification

  • Update GP Extracts Verification Capability to version 1.0.2

  • Retire GP Extracts Verification - Standard

Unstructured Data Extraction

  • Existing Epics/AC from Unstructured Data Extraction Capability merged into Document Management Capability version 1.0.2

  • Appropriate existing requirements from Unstructured Data Extraction - Standard merged into Document Management Capability version 1.0.2 as Epics/AC

  • Retire Unstructured Data Extraction Capability

  • Retire Unstructured Data Extraction - Standard Standard 

Scanning

  • Update Scanning Capability to version 1.0.2

...

Standards to be retired: 

  • Workflow - Standard

  • Communication Management - Standard

  • Digital Diagnostics - Standard

  • Document Management - Standard

  • GP Extracts Verification - Standard

  • Unstructured Data Extraction - Standard

Assurance Approach

New GEN2 Capabilities 

...